What should a post-construction cleaning checklist include?
A post-construction cleaning checklist should cover debris removal, dust extraction from every surface including high level, glass and frame cleaning with labels removed, kitchens and bathrooms, inside cupboards, floors, light fittings, sockets, doors and skirtings, then a final sparkle and sign-off per room.
A post-construction cleaning checklist should cover debris removal, dust extraction from every surface including high level, glass and frame cleaning with labels removed, kitchens and bathrooms, inside cupboards, floors, light fittings, sockets, doors and skirtings, then a final sparkle and sign-off per room.
Before the clean
Confirm trades have finished in each area, temporary protection to be lifted, power and water on, and where waste can go.
During the clean
Work top to bottom: high level first, then walls and fixtures, then floors last.
At handover
Walk the building with the site manager, record any re-cleans, then complete the sparkle clean.
